SENT US REQUEST

Do you have any questions or want to submit a request? Write to us!

REQUEST A QUOTE
Download Brochure
Download Brochure

SERVICE OVERVIEW

Commissioning testing in accordance with IMO guidance BWM.2/Circ.70/Rev.1 is now mandatory for Ballast Water Management Systems (BWMS`s) installed on newbuilds and existing ships of all flag administrations when the initial BWMS commissioning survey is completed on or after 1 June 2022.

This test is required even if the system has been partially installed and/or commissioned before 1 June 2022.

The commissioning test is also mandatory for the additional commissioning survey required after a change, replacement or significant repair of the BWMS necessary to achieve full compliance with the D-2 standard.

Techgarden are approved by DNV, ABS, RINA, BV, ClassNK and LR to conduct Biological Commissioning Testing of all Ballast Water Treatment Systems. With use of our portable test equipment, we can do the sampling and analysis onboard.

Test results will be ready within hours and report sent directly to Owner and Class Society.

Renovate has proven results for setting exceptional standards in cost control, planning, scheduling and project safety. We have experience that gives us a competitive advantage over others in our field.

1
2
3
4
download
ISO 9001 - RGB
© Copyright 2023 by Techgarden